Official planning, permit, food, liquor-license, Public Works capital-project, and project-linked City Hall records for this Sacramento neighborhood.
- T Street Bikeway Gap Closure (Rehabilitation) is in City planning or preliminary engineeringProposed
Sacramento Public Works lists T Street Bikeway Gap Closure (Rehabilitation) in the “Preliminary Engineering” phase. The project is located on T Street between 34th Street and Stockton Blvd. and proposes to reconfigure the vehicle lanes to accommodate continuous Class II bike lanes and calm traffic. The project will also include pedestrian enhancements, such as curb extensions, rectangular rapid flashing beacons, streetlighting, and signal modifications as well as pavement resurfacing, such as microsurfacing. Schedule fields are plans and may change.
- Permit issued for Krimmel/bott porch addition at 3929 SHERMAN WAYPermit Issued
City records show a permit was issued on 2026-08-21 for New front covered porch addition: construct new raised entry porch/deck with perimeter knee wall, covered by new gable composition shingle roof and adjacent low-slope standing…. An issued permit does not establish that construction has started.
- Permit issued for Cell site modifications at 2521 STOCKTON BLVDPermit Issued
City records show a permit was issued on 2026-08-03 for Modification to an existing Verizon Wireless cell site. Replacing (6) (E) antennas and (6) (E) RRU's with (6) (N) antennas and (3) (N) RRU's behind (E) FRP panels. An issued permit does not establish that construction has started.
- Application filed for garage-to-ADU conversion at 4025 Y STApplication Filed
A City permit application filed on 2026-07-24 calls for EXPEDITED - Garage conversion to create a new 506 square foot (1) bedroom ADU in an existing Duplex. No structural or roof changes. This records a proposal, not an approval or a construction start.