Neighborhood watch
Colonial Village
Official planning, permit, food, liquor-license, Public Works capital-project, and project-linked City Hall records for this Sacramento neighborhood.
- Fruitridge Road Improvements - Phase I (65th-Power Inn) is in City planning or preliminary engineeringProposed
Sacramento Public Works lists Fruitridge Road Improvements - Phase I (65th-Power Inn) in the “Preliminary Engineering” phase. This project is located on Fruitridge Rd, between 65th Street Expressway and Power Inn Rd. The purpose of the project is to rehabilitate the pavement to good condition, to calm traffic, and improve safety for bicyclists, pedestrians, drivers and transit users. The project will reduce lanes from 4 to 2, and add new separated bikeways, upgraded curb ramps and new bulb-outs, signal modernization, and pedestrian crossing enhancements. The project is currently in the preliminary engineering and environmental clearance phase. Schedule fields are plans and may change.
- Permit issued for 5211 73rd Street res electrical permit minor no plans at 5211 73RD STPermit Issued
City records show a permit was issued on 2026-08-14 for Electrical Permit: New Duplex panel like for like replacement 100 AMPs. An issued permit does not establish that construction has started.
- Application filed for garage-to-ADU conversion at 5541 79TH STApplication Filed
A City permit application filed on 2026-08-04 calls for Conversion and legalization of an existing unpermitted accessory room attached to the garage into a 211 sq. ft. ADU studio. This records a proposal, not an approval or a construction start.
- Application filed for Single Family work at 7021 ALCOTT DRApplication Filed
A City permit application filed on 2026-08-04 calls for 287sqft addition will have a bathroom and a bedroom. This records a proposal, not an approval or a construction start.
- Permit issued for 4817 Concord Road res roof permit minor no plans at 4817 CONCORD RDPermit Issued
City records show a permit was issued on 2026-07-13 for Roof Permit: Tear off and install 16 squares of 30 yr laminated dimensional composition roofing material. In-progress inspection required if 10 sq or greater. CF-6R-ENV-01…. An issued permit does not establish that construction has started.